Strathfield Library

Client:
Strathfield Council
Designed By:
Studio Hollenstein
Duration:
15 weeks

Project Details

When we tendered on this project, we teamed up with the incredibly talented team at Studio Hollenstien and pitched a very different and forward thinking Library design. Being awarded and engaged for the project from the design phase allowed us to offer our expertise throughout the finalisation of the design and build process. We completed this 1800m2 fitout in 15 weeks. The first half of the project was completed while the Library was still in operation, the second half was completed over the Christmas break. This exciting project features new highly durable flooring throughout, bright and comfortable furniture, functional and inviting joinery and clever lighting.

 